Setting Project Start Time ?

Author
Jackdied
Max Output Level: -89 dBFS
  • Total Posts : 99
  • Joined: 2012/06/11 16:37:37
  • Status: offline
2013/04/12 04:54:39 (permalink)

Setting Project Start Time ?

I use "Set timecode at Now" action a lot so it is now what i am looking for. I want to set specific measure as project start time at ruler. For example i want to  set 5:01:000 as 1:01:000 then ruler will look like "-5, -4, -3, -2, -1, 1, 2 ..." and  I'll have 5 count-in measures. How can i do that?
#1

1 Reply Related Threads

    Bristol_Jonesey
    Max Output Level: 0 dBFS
    • Total Posts : 16775
    • Joined: 2007/10/08 15:41:17
    • Location: Bristol, UK
    • Status: offline
    Re:Setting Project Start Time ? 2013/04/12 05:02:30 (permalink)
    Basically, you can't do that in Sonar.

    CbB, Platinum, 64 bit throughout
    Custom built i7 3930, 32Gb RAM, 2 x 1Tb Internal HDD, 1 x 1TB system SSD (Win 7), 1 x 500Gb system SSD (Win 10), 2 x 1Tb External HDD's, Dual boot Win 7 & Win 10 64 Bit, Saffire Pro 26, ISA One, Adam P11A,
    #2
    Jump to:
    © 2025 APG vNext Commercial Version 5.1