Just updated the CCC and then SPlat on the office rig.
As IPS was downloading CCC indicated 2 files were downloading.
When I open the CCC "Downloads" folder I only see the CCC and UP8 as "new" (today's date).
Are there any other files I need to update on the Studio rig to IPS?
Do I update the CCC on the Studio rig or wait until I bring it in and connect to the CCC?
TIA,
Tom