Partially.
I've almost finished the decorating, I've got 40 3" foam tiles to spot treat a couple of areas sitting there waiting for the spray adhesive to arrive.
What else have I got to do....
Install my Bass Traps
Beef up the door with MDF and treat it.
Put up some shelves behind where I plan on sitting, for general absorbtion
Hang my guitars!!! And sort out my pedalboard(s)
Then I have to start work on my desk. Currently all my gear is sat on a large picnic table and I've got my most critical pieces of hardware in a 10U folding rack. The new desk will accommodate everything with ease, and with space left over for expansion.
But that will be a lengthy job - I'm no carpenter, but I'll save a couple of grand by doing it myself.